Subaru Outback manuals

Subaru Outback (BR): Mechanical

READ NEXT:

 General Description of Mechanical

A: SPECIFICATION NOTE: US: Undersize OS: Oversize B: COMPONENT 1. V-BELT V-belt V-belt cover bracket V-belt tensioner ASSY Power steering pump bracket Generator

 Engine Assembly

A: REMOVAL 1) Change the front hood damper mounting position from (A) to (B), and completely open the front hood. Tightening torque: 20 N*m (2.0 kgf-m, 14.8 ft-lb) 2) Remove the V-belt covers. 3) C

 Engine Mounting

A: REMOVAL 1) Change the front hood damper mounting position from (A) to (B), and completely open the front hood. Tightening torque: 20 N*m (2.0 kgf-m, 14.8 ft-lb) 2) Disconnect the ground cable from

SEE MORE:

 Front Side Marker Light Bulb

A: REMOVAL 1) Disconnect the ground cable from battery. 2) Remove the clips and remove the air intake duct. (When removing the front turn signal light bulb RH) 3) Turn the steering wheel in the opposite direction to the headlight to be removed. Then remove the clips and turn over the mud guard.

 Timing Belt Cover

A: REMOVAL NOTE: When replacing a single part, perform the work with the engine assembly installed to body. 1) Remove the crank pulley. <Ref. to ME(H4SO)- 45, REMOVAL, Crank Pulley.> 2) Remove the stopper rod. 3) Remove the timing belt cover LH (A). 4) Remove the front timing belt cover (B)

© 2010-2026 Copyright www.suoutback.com