Subaru Outback manuals

Subaru Outback (BR): Mechanical

READ NEXT:

 General Description of Mechanical

A: SPECIFICATION NOTE: US: Undersize OS: Oversize B: COMPONENT 1. V-BELT V-belt V-belt cover bracket V-belt tensioner ASSY Power steering pump bracket Generator

 Engine Assembly

A: REMOVAL 1) Change the front hood damper mounting position from (A) to (B), and completely open the front hood. Tightening torque: 20 N*m (2.0 kgf-m, 14.8 ft-lb) 2) Remove the V-belt covers. 3) C

 Engine Mounting

A: REMOVAL 1) Change the front hood damper mounting position from (A) to (B), and completely open the front hood. Tightening torque: 20 N*m (2.0 kgf-m, 14.8 ft-lb) 2) Disconnect the ground cable from

SEE MORE:

 Battery (inspection, removal, installation)

A: REMOVAL 1) After disconnecting the battery ground terminal, remove the terminal cover, then disconnect the positive terminal. 2) Remove the battery cable holder from the battery rod. 3) Remove flange nut from the battery rod and remove battery holder. Remove the battery. B: INSTALLATION

 Oil Pressure Switch

A: REMOVAL 1) Disconnect the ground cable from battery. 2) Remove the generator. <Ref. to SC(H4SO)-18, REMOVAL, Generator.> 3) Disconnect the terminal from oil pressure switch. 4) Remove the oil pressure switch. B: INSTALLATION 1) Apply liquid gasket to the oil pressure switch threads. Li

© 2010-2026 Copyright www.suoutback.com